Track what you train, eat and measure in one app.
Log your workouts and your meals. Connect your watch through Health Connect. Fitnouriva puts all of it into one daily calorie budget. Then it compares that budget with your scale, and adjusts it if they do not agree.
Free for 7 days, then from $1.99 a week. No ads. Cancel in Google Play at any time.



- 2.1Mfoods you can search and log
- 75exercises ready to log
- 14days of weigh-ins before calibration starts
- 0ads, and no data sold
Three logs. One number.
Many people use one app for workouts, a different app for food, and a watch for steps. Fitnouriva puts all three in one place. The calorie budget on your home screen includes your full day.
Your workouts
Log each set when you do it. The app calculates the calories from your sets and reps.
Your meals
Log food by search, barcode, a photo of the label, or a photo of your plate.
Your watch
Steps, heart rate and calories come from Health Connect. Each one is counted only once.
1,542 kcal left
The budget uses an estimate of your full day. A target that is correct at breakfast is still correct at dinner.
Log sets as you lift.
The logger is made for use at the gym. It shows your numbers from last time. The rest timer continues when your screen is off. Each set gets a time stamp, so you can see how long you rest.
- Rest timerStays above your sets. Your phone vibrates when your rest ends.
- Last timeFills in your last weight and reps. Change them in steps of 2.5 kg or 5 lb.
- Any movementWeight and reps, bodyweight, time, or distance and pace. Add weight to pull-ups, or use assistance.
- ProgressSee your top set, estimated 1RM and volume for each lift, from 30 days to 1 year.
- RoutinesSave a workout as a routine. Edit it, and start from it next time.


Four ways to log a meal.
The diary shows each meal and your macros against your targets. It shows the same calorie budget as the home screen.
Search
Search a large food database. Your recent foods and favorites show first.
Barcode
Point your camera at the barcode, and the food opens.
Label
Take a photo of the nutrition label. Check the values it reads.
Plate
Take a photo of your plate. The app estimates the food, its weight and its calories.



Your watch data, read correctly.
Fitnouriva reads steps, heart rate and calories through Health Connect. Use the watch or phone that you already have.
- No double countingIf your phone and your watch both count your steps, the app uses only one of them.
- Accurate heart ratePeaks come from 5-minute averages, so one bad sensor reading does not set your max. Missing data shows as a gap.
- Where it wentYour burn is split into resting, workouts, steps and other. The total is never more than your watch measured.
- Five zonesSee your time in each heart rate zone, and at rest, for any day.




The app checks its math against your scale.
All calorie burn numbers are estimates. Fitnouriva compares your weigh-ins with the weight it predicted. If they do not agree, it adjusts your burn estimate to match your body.
Δweight × 7,700 kcal/kg = intake − scale × burn
The app solves for scale over the last four weeks. Then it uses the result on all screens.
weigh-ins over two weeks before it starts
of those days must have food logged
largest change allowed. It phases in over four weeks.
between compared weigh-ins, so one salty dinner does not change it
The app cannot tell a logging error from a burn error. Water weight does not follow 7,700 kcal/kg. For the best result, log your food every day.
More screens.









Your data stays yours.
You pay for the app, so we do not need to sell your data. Here is what leaves your phone, and when. For all the details, read the privacy policy.
Photos stay on your phone
The food photo model runs on your phone. Your photos are not uploaded.
You can say no
If you decline the privacy policy, the app still works. Only the online features stop.
Private Drive backup
Your backup goes to a hidden app folder in Google Drive. The app cannot see your other files.
Clear permissions
One screen lists all seven Health Connect permissions.
Export or delete at any time
Export all your data to a file, or delete all of it from your phone.
No ads, no data sold
We do not use ad networks or data brokers. Google Play handles all payments.
Try it free for 7 days.
One subscription gives you all the features. Google Play handles billing. You can read the full terms before you start.
- You get a reminder three days before your trial ends.
- Cancel in Google Play in two taps.
- If your plan ends, you can still export or delete your data.
free for new subscribers, on all plans
Weekly
You pay each week
Monthly
You pay each month
AnnualSave 16%
You pay each year
Prices are in US dollars. Google Play shows the price in your currency.
GET IT ONGoogle PlayFAQs
Do I need a smartwatch?
No. Workouts, food and weight work without a watch. A watch, or the step counter on your phone, adds steps, heart rate and calories through Health Connect. This makes your daily budget more accurate.
Which phones does it work on?
Android 8.0 or newer. Get it from Google Play. There is no iPhone version.
Pounds or kilograms?
Both. One setting changes weight, height, distance and pace. Your history changes with it.
How does the plate photo work?
Take a photo of your plate. A model on your phone estimates the food, its weight and its calories. Check the weight, and change it if necessary. The calories change with it. The photo stays on your phone.
What if the app cannot find a barcode?
The app opens the label scanner. Take a photo of the nutrition label and check the values. Then you can log the food. You can also send it for review. A person checks it before other people can use it.
What happens to my data if I cancel?
Your data stays on your phone. You can export it or delete it at any time, also after your subscription ends. If you have a Google Drive backup, you can restore it later.